EP000 · PLANNING STATUS

Cooperative CLI implementation checklist

This is not an implementation claim. It records what would have to be delivered before automatic cooperation could be enabled.

Passed

Planning workflow

Interactive actor, gate, execution, cooperation, close and watcher paths are documented and updated for the delivered runtime.

Blocked

CLI interface verification

Native WSL profiles are configured and actual read-only launches passed for Codex and Hermes. Claude is blocked by an expired Claude OAuth session; Gemini is blocked until an auth method/API credential is configured in WSL.

Passed

Up-front node allocation — mandatory start gate

The runtime requires every workflow node to have one approved allocation and rejects duplicate nodes plus cross-agent file/output overlap before activation.

Passed

Continuous workflow state — mandatory

State records workflow/node/task IDs, agent, model, status, percent, action, blocker, next step, evidence, heartbeat and centrally generated timestamps.

Passed

Live workflow rendering

The generated local page shows ownership, action, status, progress, blocker, next step and last update, and refreshes every 15 seconds.

Passed

Wrapper and configuration

The guarded run command activates only an approved owner, records outcome, and can use a user-verified local profile.

Passed

Assessment and safety gates

Preflight reads relevant board data without acknowledging it, labels it untrusted, and assessment records impact decisions through the board.

Passed

Cursor and failure semantics

The runtime never advances an Agent Message Board cursor; acknowledgement remains an explicit board operation after assessment.

Passed

Watcher refresh

The optional watch command checks stale heartbeats and regenerates the live view. Scheduling policy stays under user control.

Passed

Node and workflow retirement

not-required visibly records a reason for a superseded node or whole workflow, retains owner/history/evidence, and rejects retirement while a node remains active.

Blocked

Four-agent readiness

All demonstration workflow nodes are complete after safe Hermes/Codex handoff and reassignment. Codex and Hermes completed real smoke launches. The separate Claude and Gemini profile smoke nodes remain blocked until their respective providers authenticate successfully.

Passed

Acceptance evidence

Automated tests cover allocation, ownership boundaries, handoff, stale detection and rendering. run_agent.py remains unchanged.